Date:
05-12-2020
Status:
Active
This Interim Technical Guidance (ITG) provides the basic criteria guidance concerning the implementation of Risk Management Framework (RMF) for Facility-Related Control Systems (FRCS) for projects currently under design and design-build request for proposal development.
Page(s):
3
View/Download:
Federal Facility Criteria: