0
Date:
05-09-2024
Category:
Directive & Policy
Implementation:
ER 1110-2-1150 New Revision (Target Publication Date: TBD)
Status:
Active
The purpose of this Engineering and Construction Bulletin (ECB) is to reiterate the importance of the Technical Lead (TL) and clarify and reaffirm the roles and responsibilities of the TL.
Note: Attachments A and B are included in the PDF when downloaded.
Page(s):
6
View/Download:
Federal Facility Criteria: